Detailed explanation of common problems in installation of stainless steel bridge


Release time:

2024-02-17

Third, stainless steel Perforated cable tray production suppliers installation preparation: before stainless steel bridge installation, first to the site measurement

Matters needing attention in the installation of stainless steel bridges:
1.The installation of stainless steel Perforated cable tray production suppliers should first determine the direction, which should be considered from building layout, electrical pipelines, air-conditioning pipelines and follow-up maintenance convenience. 
And as far as possible along the building walls, beams, columns and other objects erected. 
2.The stainless steel bridge should carry the cable, so the weight of the cable should be taken into account in the design to see if the stainless steel bridge can bear this weight, and the installation of the bracket should also be designed according to the load. 
3.The width of the bridge should be able to put all the cables into it, so the width should be considered comprehensively from the data such as cable diameter, number of cables, cable spacing and so on. 
4.Design the installation mode of stainless steel bridge according to the installation site. 
The installation methods are suspension type, sidewall type, vertical type and hybrid type. Which method is suitable can be installed by which method, and there is no unified regulation. 
Second, stainless steel bridge installation method: 1, according to the stainless steel bridge to select the corresponding specifications of the product, before the installation waist check whether the product is regular. 
First check the factory certificate, inter-exposure and related identification documents of the product. 
The surface coating of stainless steel bridge is usually hot-dip galvanized, the surface should be free of defects, smooth, bleached, peeled and dusty. 
The bridge itself should be flat and not distorted. 
2.The stainless steel bridge should be installed in the designed position, and the height of the installation should not be less than 2.5 meters. 
If the bridge has multiple layers, it is necessary to maintain a certain distance in order to dissipate heat, release interference and facilitate maintenance. 
The size of the distance is determined according to the relevant regulations. 
3.The installation of supports and hangers is very important, and the installation quality should be in accordance with the technical specifications. 
The support span is usually 1.5 to 3 meters, and the vertical laying distance should not exceed 2 meters. 
The horizontal height of the adjacent arm must not exceed 10 mm. 
Third, stainless steel Perforated cable tray production suppliers installation preparation: before stainless steel bridge installation, first to the site measurement, more environmental planning and design, select a practical and aesthetic both style and variety, and then determine the specifications of the cable bridge, which configurations are required, and to do a good job of fire prevention and grounding treatment. 
In order to meet the above conditions, it is necessary to make a design drawing of stainless steel bridge system. 
This work is designed by professionals, which can not only make the follow-up use more convenient, but also avoid security risks, but also make more reasonable use of the space.